This is an arch dam, 70m high, built at the end of the 1950s. A detailed diagnosis of the abutment led to envisaging strengthening works, by increasing its weight.
CIGEO, (Industrial centre for geological storage of HA and MA-VL waste) – Evaluation of the warming due to the heat given off by radioactive waste and its impact on the project.